¥4988 | ≥ 1臺(tái) |
產(chǎn)品別名 |
舊路面刨除機(jī),電動(dòng)自動(dòng)行走銑刨機(jī),刨除機(jī),雙電機(jī)電動(dòng)路面銑刨機(jī) |
面向地區(qū) |
全國(guó) |
品牌 |
天德立 |
額定功率 |
380 |
11KW high power concrete floor deep drawing machine 1-2 cm Old Road Planer 300mm bridge
planer, double motor Cold milling machine
一、產(chǎn)品用途:
300型電動(dòng)自動(dòng)行走銑刨機(jī)是一款適用于混凝土地面多功能表面處理的路面機(jī)械,廣泛實(shí)用于橋面
鋪裝,橋面拉毛,錯(cuò)臺(tái)調(diào)平、舊路面刨除,以及機(jī)場(chǎng)跑道、城市廣場(chǎng)、大型工廠,物流倉(cāng)儲(chǔ)、車(chē)庫(kù)、停
車(chē)場(chǎng)等混凝土地面施工、作業(yè)中。?
Model 300 electric automatic walking milling machine is a special road surface machine
which is suitable for multi-functional surface treatment of concrete ground. It is widely
used in bridge deck pavement, bridge deck stretching, stagger table leveling, old road
surface planing, and Airport runways, city squares, large-scale factories, logistics
storage, garages, parking lots and other concrete ground construction, operations.?
二、產(chǎn)品參數(shù)
型號(hào) ZXB300
主電機(jī) 11kw/380v
自行電機(jī) 1.5kw
一次銑刨寬度 300mm
一次銑刨深度(混凝土) 5-20mm
一次銑刨深度(瀝青) 5-30mm
工作速度 4m/min
外形尺寸 1380×730×1180mm
整機(jī)重量 306kg
保養(yǎng)指南
1、為了安全起見(jiàn),在進(jìn)行保養(yǎng)前,所有的保養(yǎng)由合格的機(jī)修工來(lái)進(jìn)行。
2、機(jī)器放在平整的平面上進(jìn)行保養(yǎng)。檢查銑刀時(shí)要防止機(jī)器翻倒。
3、每次操作前用肉眼檢查機(jī)器:所有緊固件是否擰緊?是否有零件明顯磨損或開(kāi)裂?檢查軸承、檢查
個(gè)個(gè)防護(hù)罩是否蓋住,注意軸承加油,本機(jī)軸承不能缺油。
4、每次操作前,要檢查皮帶松緊度。新皮帶在運(yùn)轉(zhuǎn)4小時(shí)后應(yīng)該重新調(diào)整松緊度。有斷痕、嚴(yán)重磨損的
皮帶應(yīng)立即調(diào)換新的。調(diào)整皮帶松緊度:調(diào)整發(fā)動(dòng)機(jī)安裝底板下的兩根高度調(diào)整螺柱,通過(guò)改變電機(jī)輸
出軸和銑鼓中心軸的中心距離來(lái)控制皮帶的松緊度。保持適當(dāng)?shù)钠删o度。
5、每次改變銑刀排列時(shí),檢查銑刀軸和軸襯。如果軸上出現(xiàn)磨損的槽,就需要換新的。
Maintenance Guide 1.
For safety reasons, all maintenance must be performed by a qualified mechanic before
maintenance is performed. The machine must be maintained on a flat surface. The milling
cutter must be checked to prevent the machine from tipping over. 3. Visually inspect the
machine before each operation: Are All fasteners tightened? Are any parts visibly worn or
cracked? Check the bearings, check whether the guard cover, pay attention to the bearing
oil, the machine bearing can not be short of oil. Check the tightness of the belt before
each operation. The new belt should be re-tightened after four hours of operation. The
belt with broken marks and serious wear should be replaced immediately. ADJUST THE BELT
TIGHTNESS: adjust the two height adjustment studs under the engine mounting base plate,
control the belt tightness by changing the central distance between the motor output shaft
and the milling drum central shaft. Proper belt tightness must be maintained. 5. Every
time you change the cutter arrangement, check the cutter shaft and bushing. If a worn
groove appears on the shaft, a new one is needed.